SP Meichtry Construction

Subtitle

Decks

Cantalevered portion

« Back to Album Photo 1 of 17 Previous | Next
Cantalevered portion
Half the concrete deck was built on grade and the north side of the pool was cantalevered over the hill. This portion was rotted and leaked. We rebuilt the wood supported section for support of the new concrete and flagstone above.
Posted by Stephen P Meichtry on December 8, 2010 Full Size| Slideshow

Post a Comment

Oops!

Oops, you forgot something.

Oops!

The words you entered did not match the given text. Please try again.

Already a member? Sign In

0 Comments